Construction
Structural steel packages for contractors and developers.
Structural steel packages for main contractors and developers — design, fabrication and on-site erection, right first time.
What we offer
- Portal frames and structural steelwork
- Beams, columns and connection design
- Steelwork for extensions and alterations
- Full-package on-site installation
Structural steel packages for main contractors
We work alongside main contractors, architects and developers to deliver structural steel that's ready to install and fits first time. From detailing and load calculations in TEKLA to fabrication and craned erection on site, there's a single point of responsibility throughout.
Every package is fabricated to UKAS-approved EN1090-1 Execution Level 3 and delivered to your programme.
Execution Level 3 is the part worth understanding, because it is not a badge — it is an independently audited system covering factory production control, welder qualification, weld procedures and material traceability. It means steel can be traced back to its mill certificates, and that the CE/UKCA marking on the package is backed by records rather than an assurance. On a project where building control or a client's technical team asks for evidence, that documentation already exists.
Most of the risk on a steel package is in the connections and the setting out, not the sections. We detail and model in TEKLA and work from the engineer's design, so that holding-down bolt positions, base plates and connections are resolved before anything is cut — a column that is 20mm out is a crane sitting idle and a day lost. Where we are fabricating into an existing building we survey the real structure rather than working from the original drawings, because what was built and what was drawn are rarely identical.
We can take the whole package — design development, fabrication, delivery and craned erection with our own team — or fabricate to your engineer's drawings and leave the erection to you. Taking it end to end means one point of responsibility if something needs resolving on site, which on a tight programme is usually what decides whether a delay is an afternoon or a week.
Frequently asked
Construction steelwork — your questions
Both. We can deliver a full package — design development, fabrication, delivery and craned erection by our own team — or fabricate to your engineer's drawings and leave erection to your contractor.
It is an independently audited system covering factory production control, welder and weld procedure qualification, and material traceability, certified to Execution Class 3 (EXC3), the level used for more demanding structures. In practice it means the steel traces back to its mill certificates and the CE/UKCA marking is supported by records.
Yes, and that is the usual arrangement. We detail and model in TEKLA from the engineer's design, resolving connections, base plates and holding-down bolt positions before fabrication so the steel fits first time.
The earlier the design is fixed, the more certain the date — connection detailing and material procurement both sit ahead of fabrication. Send us the drawings and your required date and we will tell you honestly whether it is achievable.