
Steel Frames for School Buildings & Extensions
Structural steel frames for new school buildings, classroom extensions, sports halls and dining halls, designed, fabricated in our Peterlee workshop and erected by our own teams. UKAS certified to EN1090-1 Execution Level 3, and programmed around the school year.
Schools, colleges and academies make up a large part of our work. We fabricate and erect the structural steel frames for new school buildings and for extensions to existing ones, working for main contractors, local authorities, academy trusts and their architects and engineers.
The steel frame sets the pace for the rest of the build. If it arrives on time and goes up quickly, the roof, envelope and fit-out follow on. That's what we plan every school job around.
What we make for schools
- Steel frames for new school buildings: teaching blocks, dining halls and multi-storey buildings
- Classroom and school extensions, tied into the existing building
- Sports halls and large open spaces, using portal frames for wide clear spans
- Beams and columns for new openings and alterations inside existing schools
- Secondary steelwork: lintels, trimmers, bracing and support steel for services
- Steel staircases and steel fire escapes
- Canopies and covered walkways between buildings
- Handrails and balustrades built to the stricter requirements for buildings used by children
Extending an existing school
An extension has to meet a building that is already there. Floor levels, the existing frame or walls, and the way the new structure is tied in all need to be sorted before any steel is cut. We survey the existing building, model the new frame in TEKLA around it, and resolve the connections with your engineer at drawing stage, so the steel fits when it arrives. Where the structural design isn't done yet, we can arrange the calculations.
Built around the school year
Most school work has to fit the summer holidays or a half-term, or run alongside a school that stays open. We plan for that from the start:
- Steel is fabricated off site in our workshop, so the time on site is as short as possible.
- Connections are bolted wherever possible, so the frame goes up quickly with little welding on site.
- Deliveries are sequenced to the programme, so steel arrives when the crane and the gang are ready.
- On a live school site, our teams work behind the contractor's separation and follow the school's site and safeguarding rules.
Certified and documented
Structural steel for a school has to be CE or UKCA marked to EN1090-1. Our factory production control is UKAS certified up to Execution Level 3, which covers whichever execution class your engineer specifies. You get the declaration of performance, material certificates and inspection records at handover. Where the frame needs fire protection, it can be finished with intumescent paint to the fire strategy.
Our installation teams are SafeContractor approved and work to full RAMS and lift plans.
Who we work for
- Main contractors delivering school projects, as the steelwork subcontractor
- Local authorities and academy trusts commissioning new buildings and extensions
- Architects and structural engineers designing them
See our education sector page for the stairs, balustrades and access steelwork we also make for schools.
Frequently asked questions
Can the steel frame go up during the school holidays? Yes, and most school frames are programmed that way. Because everything is made off site and bolted together, the time on site is kept short.
Can you tie a new extension into the existing school building? Yes. We survey the existing building and resolve how the new frame connects to it at drawing stage, working with your structural engineer.
Do you make frames for sports halls? Yes. Sports halls and other large spaces usually use a portal frame, which gives a wide clear span with no internal columns.
Do you work for main contractors on school projects? Yes. We work as the steelwork subcontractor on a design, supply and erect basis or fabrication only.
Can you arrange the structural design? Yes. If the frame hasn't been designed yet, we can arrange the calculations and detail the steel in TEKLA from them.
Where do you work? We're based in Peterlee, County Durham, and work on schools across the North East and the rest of the UK.
For more information, contact us.